Back to Vienna
Share
Vienna · Neighborhood climate-adaptation park and family recreation space

Reinlpark in Penzing, Vienna

Penzing’s heavily used Reinlpark was rebuilt in 2022 as a greener, cooler neighborhood space with water play, mist, sport and sponge-city planting.

About 3,150 m²·Josef Reinl (1813–1866), former mayor of Penzing·Completed in 2022 after citizen participation
Introduction

Reinlpark — A Small Park Redesigned for a Hotter City

Penzing’s heavily used Reinlpark was rebuilt in 2022 as a greener, cooler neighborhood space with water play, mist, sport and sponge-city planting.

Reinlpark is a compact public park in Vienna’s 14th district, Penzing, close to Märzstraße and the Goldschlagstraße residential corridor. The City of Vienna calls it probably the most heavily used park in the densely built-up part of Penzing and gives its current area as about 3,150 square metres. What makes the park particularly useful for travel content is not historic monumentality but its 2022 redesign as a climate-adaptation project. Water play, misting elements, additional planting, larger lawns and new sport facilities turned a formerly enclosed neighborhood park into a more open green and cooling space.

The park is named for Josef Reinl, who lived from 1813 to 1866 and served as an earlier mayor of Penzing before the area became part of Vienna. That local political layer is modest but useful: the park name preserves the memory of the former independent community while the present landscape reflects twenty-first-century municipal planning. Visitors therefore encounter two different scales of local history in one place—old Penzing civic identity and very recent climate-oriented public-space design.

The 2022 project was developed after a participation process. City press material states that around 150 people contributed ideas in 2020, with requests for more greenery, more leisure possibilities and an extension toward Goldschlagstraße. The completed design responded by opening the park, adding public-space area along the adjoining street and creating a more continuous connection instead of leaving the green space behind a complete fence. This makes Reinlpark a useful small case study in how Vienna uses resident participation to reshape everyday neighborhood infrastructure.

Cooling was one of the explicit design goals. The current City page highlights barrier-free water play using bubbling and misting ground fountains, while mist columns operate depending on temperature and season. These elements are not decorative fountains intended only for viewing; they are designed so children and other park users can interact with water during hot weather. A drinking fountain and the broader water-management system add practical cooling.

The project also demonstrates the “sponge city” principle in the neighboring Goldschlagstraße. Tree planting areas are connected below paved surfaces so roots receive more room and water. Runoff from the water play and drinking facilities is directed into the sponge-city system rather than simply sent into the sewer, helping street trees during dry periods. This is an important form of information gain for a small park page because the climate infrastructure is partly invisible once construction is complete.

Planting was expanded through perennial and grass beds and a mix of fragrant, flowering and berry-producing shrubs. The City also states that valuable mature trees were largely preserved and existing lawns enlarged. Automatic irrigation supports the green areas. Together, these measures make the project more than a playground refresh: the park was redesigned as a cooler ecological pocket within dense Penzing.

Current recreation includes an upgraded toddler playground, a calisthenics installation, two table-tennis tables, a double swing and a retained ball-game cage. The adjacent Familienbad Reinlgasse is a separate facility with its own seasonal hours and admission; it should not be confused with the park itself. The 2022 redesign created a safer and more direct relationship to that family pool, but park access remains independent.

There is no admission fee and the current City page publishes no fixed gate schedule for Reinlpark. The seven-day table therefore states that no fixed gate hours are published. Tram 10 serves Reinlpark/Märzstraße in current City project material, while other nearby Penzing connections can be checked through WienMobil. Exact surface routing can change over time.

Accessibility is one of the redesign’s explicit themes. The City calls the water-play area barrier-free and states that access toward the children’s pool was improved. That does not amount to a complete accessibility audit for every play and sport element, so visitors with specific needs should still verify the exact route.

A useful visit lasts thirty to sixty minutes. Reinlpark is particularly worthwhile for urban-planning travellers, families using the water play in hot weather and visitors interested in climate adaptation at neighborhood scale. Its value is contemporary and practical: a tiny, heavily used green space shows how Vienna is redesigning streets and parks to cope with heat while giving residents more room to play, exercise and sit outdoors.

At a glance

Quick Facts

Essential context and practical details for planning your visit.

AreaAbout 3,150 m²
Named forJosef Reinl (1813–1866), former mayor of Penzing
Major redesignCompleted in 2022 after citizen participation
Climate featuresBarrier-free water play, mist columns, expanded planting, automatic irrigation and sponge-city tree infrastructure in Goldschlagstraße
Current recreationToddler playground, calisthenics, two table-tennis tables, double swing and ball-game cage
Vienna guide

The 2022 Reinlpark Redesign

The City completed the redesign in September 2022 after a participation process involving roughly 150 local contributors. The strongest requests were more green space, more recreation and a better relationship between park and Goldschlagstraße.

The project opened the previously fully fenced park and converted about 1,100 square metres of the adjoining street into additional green and public space. Seating steps and lighter paving improved the transition between park and street.

This makes the park useful for understanding public-space expansion without acquiring new land: part of the street was redesigned so the green space could work beyond its old boundary.

The opening of the park toward Goldschlagstraße is especially important because it changed how the green space meets the neighborhood. Before the redesign, a complete fence reinforced the sense of a contained recreation area. The 2022 project added seating steps and public space along the street edge, so movement between sidewalk and park became more direct. For urban-design visitors, that transition is as informative as the new playground equipment because it shows how Vienna can enlarge the social function of a park without acquiring an entirely new site.

Reinlpark in Vienna, Austria
Reinlpark in Vienna, Austria

Vienna guide

Water Play, Mist and the Sponge-City Principle

Cooling infrastructure is central to Reinlpark. Barrier-free ground fountains bubble and mist during hot conditions, while separate mist columns add cooling at several points.

The neighboring Goldschlagstraße uses the sponge-city principle, connecting root zones below paved surfaces so trees have more soil volume and stored water. Water from the play and drinking systems is reused within this local water cycle.

For visitors, the visible fountains are only one part of the climate project. Much of the most important work sits below the paving, where root space and water storage improve the long-term survival of urban trees.

The climate strategy also depends on preserving and supporting trees rather than relying only on mechanical mist. The City retained valuable mature specimens, enlarged lawn areas and added new perennial, grass and shrub planting. Automatic irrigation and the sponge-city root system help vegetation survive dry periods, so the cooling effect should strengthen as newer trees establish. This makes Reinlpark a useful place to compare immediate cooling devices, such as mist columns, with slower green infrastructure that develops over years.

Reinlpark in Vienna, Austria
Reinlpark in Vienna, Austria

Vienna guide

Planning a Reinlpark Visit

Reinlpark is in Penzing close to Märzstraße and Goldschlagstraße. Tram 10 to Reinlpark/Märzstraße is a useful transport reference; check WienMobil for the current network.

There is no ticket and no fixed park gate timetable. The adjacent Familienbad Reinlgasse is separate and has seasonal admission and opening hours.

Allow thirty to sixty minutes for a design-focused visit, or longer with children in warm weather. Water features are weather- and season-dependent.

The adjacent Familienbad Reinlgasse can extend a summer family visit, but its separate identity matters. Pool opening dates, admission and weather closures apply only to the bath; the park remains independent public space. Keeping those two facilities separate prevents a common travel-data error in which seasonal pool hours are mistakenly presented as Reinlpark opening times.

It works.

Reinlpark in Vienna, Austria
Reinlpark in Vienna, Austria
Traveller insights

Community Ratings & Reviews

No traveller ratings yet

5★0%
4★0%
3★0%
2★0%
1★0%
Filter by:

Share your experience at Reinlpark

Your email address will not be published. Required fields are marked *

Overall rating *

Traveller reviews

Loading reviews…

    Continue exploring

    Nearby places

    More places to explore in and around Vienna.